Well the day has finally arrived, that's right we have finished the kitchen.
So now we are up to the final touches and then sign off from the Council.
Sunday, July 27, 2014
Sunday, June 22, 2014
heading for the home straight
So here we are heading towards the finish line, the bathroom
is in full swing and this weekend the Kitchen and laundry arrived so it will
not be long until we are all done.
The Kitchen arrived and Adam the installer put in a huge day
in an effort to get them both installed. Unfortunately shipping containers aren’t
very square so a fair it of jiggling to get it all in and lined up was
required. But then disaster when he finds out the bench top is supplied wrong and
we cannot finish the kitchen. Anyway he gets the laundry done and all the
cupboards in the kitchen are in we just can’t finish the bench top.
So Friday the plumber is on deck to finish the final fix,
another big day ahead with full final fix, and pump to install all goes pretty
well and we have running water and wait for yes it is true a flushing toilet.
But true to current form with the bathroom which has had its
fairs share of delays, the drain is wrong for the vanity so we couldn’t finish
that off.
So the bathroom is so close with the shower screen nearly
done. We move on to tiling the laundry which we manage to finish. Oven is in
the kitchen next week the gas plumber is coming so fingers crossed next weekend
we will have a finished kitchen as well
Sunday, June 1, 2014
Wall tiling is done!
Well it has taken a long time, delays in getting tiles,
overseas holidays but it is done and the bathroom tiling is done. Just some paint
touch ups and it is ready for final finishing and fittings.
Saturday, May 10, 2014
Wall tiles weekend No. 2
Wall tiling again this weekend, but we can’t finish because there is a
delay getting the feature tiles.
Saturday, May 3, 2014
More tiling but walls this time
With the floors done the next project is to finish the
bathroom. Unfortunately with my surgery and knee injuries over the last few
months progress has been slow, but we are getting there.
So the wall tiles in the bathroom are the next job as well
as some skirt tiles in the laundry and kitchen were knocked off.
Wednesday, April 30, 2014
The floors are done
With all the tiling finished we just needed to complete all the
grouting and fit all the skirtings and the whole house is now fully tilled.
Wednesday, February 26, 2014
Bathroom
Well February has moved us into the Bathroom, first job is
to complete the water proofing. It is a far cry from the waterproofing of old
with no respirator required and just a fan and an open window for ventilation.
Once completed and signed off we move onto our final floor tiling
job. The shower rose first and then the rest of the floor.
Sunday, January 19, 2014
Doors and Trimmings