Tina and I head back on the weekend and with the tank connected awaited rain. They always say be careful what you wish for and down it came 100mm filling the tank in about 2 ½ hours. We did manage to fit the barge nesting channels on the workshop roof, weld the workshop containers to the stumps and fix up some water runoff issues. With all the rain we had some time to remove numbers from the containers which seems to be a never ending job. There was a bit of of OH&S incident but we can report no serious injuries.
Tuesday, November 15, 2011
We have water
I managed to pick up a load of seconds paver from a local manufacturer and it is our intention to fully pave under the workshop roof. This will need quite a bit of thought about slope run off etc as the rain comes in some mighty angles so there is always some water underneath the roof.
Tina and I head back on the weekend and with the tank connected awaited rain. They always say be careful what you wish for and down it came 100mm filling the tank in about 2 ½ hours. We did manage to fit the barge nesting channels on the workshop roof, weld the workshop containers to the stumps and fix up some water runoff issues. With all the rain we had some time to remove numbers from the containers which seems to be a never ending job. There was a bit of of OH&S incident but we can report no serious injuries.
Tina and I head back on the weekend and with the tank connected awaited rain. They always say be careful what you wish for and down it came 100mm filling the tank in about 2 ½ hours. We did manage to fit the barge nesting channels on the workshop roof, weld the workshop containers to the stumps and fix up some water runoff issues. With all the rain we had some time to remove numbers from the containers which seems to be a never ending job. There was a bit of of OH&S incident but we can report no serious injuries.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment