The electrician
came so we spend a lot of the morning wring up the power box and mains to allow
for the connection of power. Ergon a scheduled to run the poles and wires up
the street in the next fortnight so we could soon have power removing the need
to run generators to do all the work. Our 12 volt solar system has run extremely
well at the workshop supplying all our power needs for living and we will continued
to utilise this as it is free.
With the power ready to be connected it was off to install windows. As Tina cannot help me all the time while I’m doing this se was off to build a garden along the top of the embankment between the workshop and the house.
A couple of
minor construction errors did not help the cause but we did complete installing
the 4 windows as well as finishing the garden bed. It has been really dry in
Tully the ;ast 2-3 weeks so we are hoping of at least a bit of rain to ensure
all the new plants arrive.
The tractor
too is getting a makeover with some real tractor tyres coming.