Saturday, October 20, 2012
House pad site works completed
We have finished running all the underground services now with water power and most recently sewerage run over to the house. This has allowed us to finish putting down road base up at the site house pad and we have added road base under the house and deck which will reduce the impact of wet season red mud. It was pretty hard work raking out all the road base under the house but all looks good now.



Saturday, October 13, 2012
The workshop gets a gutter and downpipe upgrade
When we first roofed the workshop we were supplied
the wrong gutter but we installed it anyway under the guidance of the great fishing
guru !! Only to receive the correct gutter at a later date which was still like
9 months ago. As we have been focusing on the house it has been neglected. So I’m not entirely sure of the circumstances
but recently we installed the new correct one piece gutter and down pipe to the
tank which includes a leaf extractor and first flush system. We also incorporated
the same system that we used up the house which was to install a down pipe at
the other end of the gutter which will allow run off in tomes of heavy rain . (
that is a little funny really it is Tully)
Saturday, September 8, 2012
Ships ropes finish of bottom garden
So September
has some birthdays, concerts and overseas trips all which meant not lots of
work was getting done. But none the less, we have achieved lots.
Tina has
got some ship rope and we have used this as edging for our garden in front of
the workshop. We have extended the garden a little, had some ballast added to
the driveway with this section nearly finished other than some more plants
Thursday, August 30, 2012
Sorry for the delay but we are back
Firstly
sorry for the delay in this update it is always amazing how much time flies.
Well it is not like we have not been doing anything but most of the wok we have
done isn’t really that visual unlike previous updates. So well it has been so
long I’m not really sure what order some of these thing have occurred but I will
describe the progress in no particular order. It is true to say that we have
during August, September and October had our fair share of socialising in
Cairns.
Here is a cool shot of the Tully valley in the morning before the mist is burnt off.
So we are working on fitting ceramic tile
underlay to the floors this is a nasty job with hundreds of nails require din
each sheet and 25 sheets to do. Well I think it is great exercise but Tina is
not so happy to do this. There is some heated discussion at the moment about
using a nail gun which a friend of ours has offered I think the exercise is
good, but best we not discuss this further
Saturday, July 21, 2012
What no windows left
Well another weekend and more windows to do,
we built the last wall in the lounge and installed the 2 last windows all 12
in.
Next job was the Sliding door, we thought
we would need some help on this but a design review showed that we would be
better off installing it from the inside so we were able to this by
ourselves. Tina was a little worried but
we are really getting the hang of this cutting holes and fitting stuff in. The
sliding door went in easy and looks great.
So all the windows are done and now 2 external doors to go and we are
finished cutting holes.
We spent a day gardening as well with
mulching the embankment on the driveway and mulching some of the orchard. Still
waiting for a plumber though L
Saturday, July 14, 2012
What more windows
Andy had big plans for this weekend, he
intended on putting in 4 more windows, I was a bit sceptical as 2 of these
there were in Jason’s room and to put these in we had to cut off the 2 doors
off one of the 40ft containers………… and build a wall. Shame on me for having doubt we smashed it in.
Now our bedroom room has 2 windows and Jason’s room has a new wall & 2
beautiful louver windows, and just to prove how clever he was he decided to
start cutting the hole for the sliding door.
Friday, July 13, 2012
We nearly have power
We were most excited when we turned up Sunshine road and there were 3 power poles, yahoooo Ergon are coming through at last, there is 1 more pole to go in and then the “linies”(this is Ergon lingo Andy has picked up) can come in and run the power line and connect us up to 240volts
Thursday, July 12, 2012
Does the tank have a leak??
When we arrived at the block we weren’t too
sure what to expect, as Tully has again had record July rain falls (124mm in
24hours), so much for the dry season or as the locals would call it Winter! But
when we arrived there was not too much damage which we were happy about.
The main rain water tank is full and could have been 2 times over with the volume of rain we have had, and no signs of a leak this week, but we will have to keep an eye for this possible leak in the tank. We decided to disconnect the storm water to see if what is in the tank will drain out. Crossed fingers there is nothing to worry about.
The main rain water tank is full and could have been 2 times over with the volume of rain we have had, and no signs of a leak this week, but we will have to keep an eye for this possible leak in the tank. We decided to disconnect the storm water to see if what is in the tank will drain out. Crossed fingers there is nothing to worry about.
Sunday, July 8, 2012
Counting down the Windows
Windows
were the focus of this weekend with a goal to install 4 windows. So it was the Kitchen,
Kirsten’s room as well as the first set of Louvre’s in the Dining room.
With the power ready to be connected it was off to install windows. As Tina cannot help me all the time while I’m doing this se was off to build a garden along the top of the embankment between the workshop and the house.
The electrician
came so we spend a lot of the morning wring up the power box and mains to allow
for the connection of power. Ergon a scheduled to run the poles and wires up
the street in the next fortnight so we could soon have power removing the need
to run generators to do all the work. Our 12 volt solar system has run extremely
well at the workshop supplying all our power needs for living and we will continued
to utilise this as it is free.
With the power ready to be connected it was off to install windows. As Tina cannot help me all the time while I’m doing this se was off to build a garden along the top of the embankment between the workshop and the house.
A couple of
minor construction errors did not help the cause but we did complete installing
the 4 windows as well as finishing the garden bed. It has been really dry in
Tully the ;ast 2-3 weeks so we are hoping of at least a bit of rain to ensure
all the new plants arrive.
The tractor
too is getting a makeover with some real tractor tyres coming.
Wednesday, June 27, 2012
re-vegetation works
After
having relocated all the fruit trees due to ongoing earthworks, Tina has
planted her pumpkin patch and we have started work on revegetating the
embankment behind the house. There are quite few ferns popping up around the
place so I intend to transplant some of these as well.
Monday, June 25, 2012
the local reptiles
Well we
always new they were there everyone has told how many there are, how big they
are and how they can just take you off into the rain forest but we finally saw
our first snake today. Good news though
he is a friendly one just a common Python a bit over 2metre long. Now they tell
me the more of those that are around the less of the nasty ones that are there.
This time of year there are plenty of them around as they have started cutting
sugar cane and that’s where lots of them live.
Saturday, June 23, 2012
Let it rain in Tully
This week’s
goal was to deliver and install the rain water tank. As their truck is too big
to get up the hill and past the house to where we wanted it, Tina arranged to
borrow the truck form work and we picked it up ourselves and drove it to site.
Now after much reassurance form the supplier who assures us they just tip them
off the truck we lined it up joined a rope to the tank with the tractor and
under Tina’s careful driving skills pulled it off the truck nearly into place.
Only problem was the outlets were not line dup correctly so we had to spin it
around, no easy feat. But ath the end of the day there it was in place fully
connected, so just need it to rain in Tully. ( that shouldn’t take too long)
Monday, June 18, 2012
Here comes the power
The jobs
are just getting completed so fast it is hard to keep track we have laid the
power cable from the workshop underground to the house and already engaged an
electrician who his making up the 2 switchboards required and coming to site
soon to install them. All we need next is Ergon to come out and actually put up
the poles and cable to get the power there. You would think that working at Ergon
would give me some pull to get it done faster, but I think it may be the
opposite.
(sorry about the photos blogger has gone back to not rotating them again)
(sorry about the photos blogger has gone back to not rotating them again)
Saturday, June 16, 2012
We have gutters
To our great surprise the gutters have arrived
and 3rd time lucky they are correct. A couple of hairy moments to
get them on the roof but they are in and storm water down pipes are finally
connected now all we need is a tank. We are pretty happy to have ended up with
12m+ one piece gutters (no joins) Chris has come back and levelled of the site
pad and placed some rubble over the top, well except for the section that the
water and septic pipes have not been laid yet
Wednesday, June 13, 2012
And then there was light - through the windows
The trenching
for the stormwater is also done, we have completed this up to 90%......... we
are still waiting on the gutters, third time luck hey QLDS.
One window in, but wait it needs to come out again, we have finally worked out the window installation design so we need to take it out to make a slight adjustment. We are adding an angle iron bar across the top of them all to fill in the profile gap to ensure no water can leak in under any circumstances. So 2 windows now completed
With all
the physical work of digging we decided we needed a rest….. so we installed our
1st window, we chose the bathroom for this, for 2 reasons, if we can
ever get a plumber to come out he see without artificial and can start work,
and it definitely sheds some light into that end of the house. Today we knocked
off 5 mins early J
One window in, but wait it needs to come out again, we have finally worked out the window installation design so we need to take it out to make a slight adjustment. We are adding an angle iron bar across the top of them all to fill in the profile gap to ensure no water can leak in under any circumstances. So 2 windows now completed
Saturday, June 9, 2012
A Trenching we will go
Finally the
sun has burned through the clouds and we have had a sunny week so away with the
trenching Chris goes. We have trenching for the electrical cables (house to
workshop down the middle of the driveway) for this we needed another new tool!
A trenching shovel, and after a day shovelling I guess I can see why we needed
one, so many different tools, it makes some many jobs easier.
Sunday, June 3, 2012
Room Room Room
Well
another weekend of rain, so no trenching to be done again. We have purchased
the materials to build the internal walls so we make that our goal for the
weekend. It is quite easy and doesn’t take a lot of effort compared to other
jobs we have done in the past.
So
an easy day on Saturday with 3 walls completed. We now have a bathroom laundry,
bedroom 2 & the study. We were really impressed at how big each room turned
out.
We plant our latest fruit tree, an Abui which
is a native of the Amazon region. It tastes like caramel custard but is not
grown commercially as it does not travel, another addition to our ever going
orchard.
Subscribe to:
Posts (Atom)