Andy had big plans for this weekend, he
intended on putting in 4 more windows, I was a bit sceptical as 2 of these
there were in Jason’s room and to put these in we had to cut off the 2 doors
off one of the 40ft containers………… and build a wall. Shame on me for having doubt we smashed it in.
Now our bedroom room has 2 windows and Jason’s room has a new wall & 2
beautiful louver windows, and just to prove how clever he was he decided to
start cutting the hole for the sliding door.
Saturday, July 14, 2012
Friday, July 13, 2012
We nearly have power
We were most excited when we turned up Sunshine road and there were 3 power poles, yahoooo Ergon are coming through at last, there is 1 more pole to go in and then the “linies”(this is Ergon lingo Andy has picked up) can come in and run the power line and connect us up to 240volts
Thursday, July 12, 2012
Does the tank have a leak??
When we arrived at the block we weren’t too
sure what to expect, as Tully has again had record July rain falls (124mm in
24hours), so much for the dry season or as the locals would call it Winter! But
when we arrived there was not too much damage which we were happy about.
The main rain water tank is full and could have been 2 times over with the volume of rain we have had, and no signs of a leak this week, but we will have to keep an eye for this possible leak in the tank. We decided to disconnect the storm water to see if what is in the tank will drain out. Crossed fingers there is nothing to worry about.
The main rain water tank is full and could have been 2 times over with the volume of rain we have had, and no signs of a leak this week, but we will have to keep an eye for this possible leak in the tank. We decided to disconnect the storm water to see if what is in the tank will drain out. Crossed fingers there is nothing to worry about.
Sunday, July 8, 2012
Counting down the Windows
Windows
were the focus of this weekend with a goal to install 4 windows. So it was the Kitchen,
Kirsten’s room as well as the first set of Louvre’s in the Dining room.
With the power ready to be connected it was off to install windows. As Tina cannot help me all the time while I’m doing this se was off to build a garden along the top of the embankment between the workshop and the house.
The electrician
came so we spend a lot of the morning wring up the power box and mains to allow
for the connection of power. Ergon a scheduled to run the poles and wires up
the street in the next fortnight so we could soon have power removing the need
to run generators to do all the work. Our 12 volt solar system has run extremely
well at the workshop supplying all our power needs for living and we will continued
to utilise this as it is free.
With the power ready to be connected it was off to install windows. As Tina cannot help me all the time while I’m doing this se was off to build a garden along the top of the embankment between the workshop and the house.
A couple of
minor construction errors did not help the cause but we did complete installing
the 4 windows as well as finishing the garden bed. It has been really dry in
Tully the ;ast 2-3 weeks so we are hoping of at least a bit of rain to ensure
all the new plants arrive.
The tractor
too is getting a makeover with some real tractor tyres coming.
Wednesday, June 27, 2012
re-vegetation works
After
having relocated all the fruit trees due to ongoing earthworks, Tina has
planted her pumpkin patch and we have started work on revegetating the
embankment behind the house. There are quite few ferns popping up around the
place so I intend to transplant some of these as well.
Monday, June 25, 2012
the local reptiles
Well we
always new they were there everyone has told how many there are, how big they
are and how they can just take you off into the rain forest but we finally saw
our first snake today. Good news though
he is a friendly one just a common Python a bit over 2metre long. Now they tell
me the more of those that are around the less of the nasty ones that are there.
This time of year there are plenty of them around as they have started cutting
sugar cane and that’s where lots of them live.
Saturday, June 23, 2012
Let it rain in Tully
This week’s
goal was to deliver and install the rain water tank. As their truck is too big
to get up the hill and past the house to where we wanted it, Tina arranged to
borrow the truck form work and we picked it up ourselves and drove it to site.
Now after much reassurance form the supplier who assures us they just tip them
off the truck we lined it up joined a rope to the tank with the tractor and
under Tina’s careful driving skills pulled it off the truck nearly into place.
Only problem was the outlets were not line dup correctly so we had to spin it
around, no easy feat. But ath the end of the day there it was in place fully
connected, so just need it to rain in Tully. ( that shouldn’t take too long)
Monday, June 18, 2012
Here comes the power
The jobs
are just getting completed so fast it is hard to keep track we have laid the
power cable from the workshop underground to the house and already engaged an
electrician who his making up the 2 switchboards required and coming to site
soon to install them. All we need next is Ergon to come out and actually put up
the poles and cable to get the power there. You would think that working at Ergon
would give me some pull to get it done faster, but I think it may be the
opposite.
(sorry about the photos blogger has gone back to not rotating them again)
(sorry about the photos blogger has gone back to not rotating them again)
Saturday, June 16, 2012
We have gutters
To our great surprise the gutters have arrived
and 3rd time lucky they are correct. A couple of hairy moments to
get them on the roof but they are in and storm water down pipes are finally
connected now all we need is a tank. We are pretty happy to have ended up with
12m+ one piece gutters (no joins) Chris has come back and levelled of the site
pad and placed some rubble over the top, well except for the section that the
water and septic pipes have not been laid yet
Wednesday, June 13, 2012
And then there was light - through the windows
The trenching
for the stormwater is also done, we have completed this up to 90%......... we
are still waiting on the gutters, third time luck hey QLDS.
One window in, but wait it needs to come out again, we have finally worked out the window installation design so we need to take it out to make a slight adjustment. We are adding an angle iron bar across the top of them all to fill in the profile gap to ensure no water can leak in under any circumstances. So 2 windows now completed
With all
the physical work of digging we decided we needed a rest….. so we installed our
1st window, we chose the bathroom for this, for 2 reasons, if we can
ever get a plumber to come out he see without artificial and can start work,
and it definitely sheds some light into that end of the house. Today we knocked
off 5 mins early J
One window in, but wait it needs to come out again, we have finally worked out the window installation design so we need to take it out to make a slight adjustment. We are adding an angle iron bar across the top of them all to fill in the profile gap to ensure no water can leak in under any circumstances. So 2 windows now completed
Saturday, June 9, 2012
A Trenching we will go
Finally the
sun has burned through the clouds and we have had a sunny week so away with the
trenching Chris goes. We have trenching for the electrical cables (house to
workshop down the middle of the driveway) for this we needed another new tool!
A trenching shovel, and after a day shovelling I guess I can see why we needed
one, so many different tools, it makes some many jobs easier.
Sunday, June 3, 2012
Room Room Room
Well
another weekend of rain, so no trenching to be done again. We have purchased
the materials to build the internal walls so we make that our goal for the
weekend. It is quite easy and doesn’t take a lot of effort compared to other
jobs we have done in the past.
So
an easy day on Saturday with 3 walls completed. We now have a bathroom laundry,
bedroom 2 & the study. We were really impressed at how big each room turned
out.
We plant our latest fruit tree, an Abui which
is a native of the Amazon region. It tastes like caramel custard but is not
grown commercially as it does not travel, another addition to our ever going
orchard.
Sunday, May 20, 2012
The Wet has returned
And we thought the wet season was over, how wrong were we? This weekend it rained most of the day on Saturday and really poured down Saturday night. Lucky we have the roof on because the rain does not really interfere in our plans anymore.
While we were waiting for the plumber to arrive, we fitted all of the ceiling battens in our bedroom. That went all well except for the 5 minutes we had an encounter with a large huntsman spider, Andy chased it around for a while trying to catch it, in the end we secured it under an old butter container with some cutting blades on top just in case he had super powers and would have been able to escape. When we had finished the ceiling battens I remove the spider from the house back outside where it belongs.
.
I think the
most fun thing we did on Saturday was pulling out / cutting down the 3 palm
trees on our neighbors block. We had to do this, it was requested by Ergon, and
we didn’t want to give them any excuses as to why they have to delay erecting
the power poles, which would delay our connection to mains power.
And we thought the wet season was over, how wrong were we? This weekend it rained most of the day on Saturday and really poured down Saturday night. Lucky we have the roof on because the rain does not really interfere in our plans anymore.
After that we marked out where the trenches need to be dug for the storm water / plumbing / and electrical. But with the forecast for next week – rain, rain, and more rain I don’t think the trenches will get dug, and I bet we have to re-marks the ground again.
There was a break in the weather so Andy climbed up the ladder for the 500thtime to put up the last of the gutter brackets, while I had a very important job of holding the ladder
.
Plumber 1
never turned up! (he didn’t even bother
call to say he couldn’t make it, bloody tradies). So that gave a young local
lad Levi the opportunity to quote on the work. We are crossing our fingers he
will be able to come through with a competitive price.
Most of
Sunday was spent clearing the re-growth from the edge of the rainforest, just
so the sakes have time to realize that they are out in to open and to turn
around an head back into the protection of the rainforest.
I armed
myself with the whipper snipper and tackled the grass that was starting to
smother one of your re-vegetated sites.
After that we marked out where the trenches need to be dug for the storm water / plumbing / and electrical. But with the forecast for next week – rain, rain, and more rain I don’t think the trenches will get dug, and I bet we have to re-marks the ground again.
Saturday, May 5, 2012
We have a Roof
So the bid
day has arrived, its roofing day. With some additional help from Muna, Klaus
and Damien we set about roofing the house. After a pilot test of fitting
insulation and sheeting we were away. It is hard work on the roof laying
insulation and roofing especially with our limited scaffolding to make the job
easier. After a long days effort thought it was done all the sheets were
laid in a single day.
A special
thanks to the crew who assisted. That left Tina and I 2 days to finish fitting
all the roofing screws and fitting the Ridge & Barge capping. Well we can
say apart form the odd screw and a little tidy up work the roof is finished
with only the gutters left to complete this mammoth part of our project. It is
a huge step and really makes it look like we are making progress again
Tuesday, May 1, 2012
New Car Park
In an
effort to create some level parking, especially after the Tojo crash in the car
park. Our excavator man Jess was summoned back to site to cut out a car park
and a flat area behind the container. We have noticed that Jess does like to
dig and soon we were convinced that if we are going to cut out a section behind
the container we ay as well make it big enough to drive a car down. This sounds
good in theory but wow do we have some big embankments now. So now some clever
planning will be required to ensure these do not wash away in the rain.
Tuesday, April 17, 2012
Roof Works continue
Well April has
brought a flurry of activity, a trip to Adelaide
to catch up with the kids and family has not slowed down progress. We have
finally managed to paint the main roof beams with the acquisition of a Wagner
Airless paint gun. This has made a difficult job easy and boy does it spray
paint you can literality watch the paint drum empty. So with beams painted and
roofing materials ordered next job is to fit the purlins and roof bracing.
This was completed over 2 weekends and some scary moments adding the barge nesting channels but all done no injuries
This was completed over 2 weekends and some scary moments adding the barge nesting channels but all done no injuries
Friday, March 30, 2012
The wet has broken
Well after some serious wet season rain over 500mm in one week the block and all the driveways and runoffs have handled it all well with no wash outs to be seen. The rain has passed for now and it is a hot sunny weekend that greets us. Our new Paint gun in hand we are determined to complete the roof beams which need a good sanding down of wet season rust before painting. It is hard work and high off the ground so lots of ladder climbing and scaffold moves. But as you will see form the photos the results are great and now we are ready to put the roof up. Twice as big as the first one we built over the workshop and at 4-0m off the ground somewhat scary task.
Tuesday, March 13, 2012
back to work on the house
The luxury upgrades continue with the inclusion of a sliding door kindly donated by our neighbour.
We are back into the house and have cut out the door holes to the main bedroom, bathroom, laundry and the opening between the dinging lounge area. Now we can get to all the rooms we are going to start calling it a house.
Roofing material have been ordered so soon we will have that roof on – any volunteers?? Free board. Food, beer and of course local native wildlife in abundance.