Thursday, August 30, 2012

Sorry for the delay but we are back


Firstly sorry for the delay in this update it is always amazing how much time flies. Well it is not like we have not been doing anything but most of the wok we have done isn’t really that visual unlike previous updates. So well it has been so long I’m not really sure what order some of these thing have occurred but I will describe the progress in no particular order. It is true to say that we have during August, September and October had our fair share of socialising in Cairns.
 
Here is a cool shot of the Tully valley in the morning before the mist is burnt off.
 


So we are working on fitting ceramic tile underlay to the floors this is a nasty job with hundreds of nails require din each sheet and 25 sheets to do. Well I think it is great exercise but Tina is not so happy to do this. There is some heated discussion at the moment about using a nail gun which a friend of ours has offered I think the exercise is good, but best we not discuss this further

 

Saturday, July 21, 2012

What no windows left

Well another weekend and more windows to do, we built the last wall in the lounge and installed the 2 last windows all 12 in.



Next job was the Sliding door, we thought we would need some help on this but a design review showed that we would be better off installing it from the inside so we were able to this by ourselves.  Tina was a little worried but we are really getting the hang of this cutting holes and fitting stuff in. The sliding door went in easy and looks great.  So all the windows are done and now 2 external doors to go and we are finished cutting holes.






We spent a day gardening as well with mulching the embankment on the driveway and mulching some of the orchard. Still waiting for a plumber though L

Saturday, July 14, 2012

What more windows












Andy had big plans for this weekend, he intended on putting in 4 more windows, I was a bit sceptical as 2 of these there were in Jason’s room and to put these in we had to cut off the 2 doors off one of the 40ft containers………… and build a wall.  Shame on me for having doubt we smashed it in. Now our bedroom room has 2 windows and Jason’s room has a new wall & 2 beautiful louver windows, and just to prove how clever he was he decided to start cutting the hole for the sliding door.




Friday, July 13, 2012

We nearly have power


We were most excited when we turned up Sunshine road and there were 3 power poles, yahoooo Ergon are coming through at last, there is 1 more pole to go in and then the “linies”(this is Ergon lingo Andy has picked up) can come in and run the power line and connect us up to 240volts

Thursday, July 12, 2012

Does the tank have a leak??

When we arrived at the block we weren’t too sure what to expect, as Tully has again had record July rain falls (124mm in 24hours), so much for the dry season or as the locals would call it Winter! But when we arrived there was not too much damage which we were happy about.

The main rain water tank is full and could have been 2 times over with the volume of rain we have had, and no signs of a leak this week, but we will have to keep an eye for this possible leak in the tank.  We decided to disconnect the storm water to see if what is in the tank will drain out. Crossed fingers there is nothing to worry about.

Sunday, July 8, 2012

Counting down the Windows

Windows were the focus of this weekend with a goal to install 4 windows. So it was the Kitchen, Kirsten’s room as well as the first set of Louvre’s in the Dining room.

The electrician came so we spend a lot of the morning wring up the power box and mains to allow for the connection of power. Ergon a scheduled to run the poles and wires up the street in the next fortnight so we could soon have power removing the need to run generators to do all the work. Our 12 volt solar system has run extremely well at the workshop supplying all our power needs for living and we will continued to utilise this as it is free.









With the power ready to be connected it was off to install windows. As Tina cannot help me all the time while I’m doing this se was off to build a garden along the top of the  embankment between the workshop and the house.


A couple of minor construction errors did not help the cause but we did complete installing the 4 windows as well as finishing the garden bed. It has been really dry in Tully the ;ast 2-3 weeks so we are hoping of at least a bit of rain to ensure all the new plants arrive.

The tractor too is getting a makeover with some real tractor tyres coming.


Wednesday, June 27, 2012

re-vegetation works

After having relocated all the fruit trees due to ongoing earthworks, Tina has planted her pumpkin patch and we have started work on revegetating the embankment behind the house. There are quite few ferns popping up around the place so I intend to transplant some of these as well.


Monday, June 25, 2012

the local reptiles

Well we always new they were there everyone has told how many there are, how big they are and how they can just take you off into the rain forest but we finally saw our first  snake today. Good news though he is a friendly one just a common Python a bit over 2metre long. Now they tell me the more of those that are around the less of the nasty ones that are there. This time of year there are plenty of them around as they have started cutting sugar cane and that’s where lots of them live.

Saturday, June 23, 2012

Let it rain in Tully


This week’s goal was to deliver and install the rain water tank. As their truck is too big to get up the hill and past the house to where we wanted it, Tina arranged to borrow the truck form work and we picked it up ourselves and drove it to site. Now after much reassurance form the supplier who assures us they just tip them off the truck we lined it up joined a rope to the tank with the tractor and under Tina’s careful driving skills pulled it off the truck nearly into place. Only problem was the outlets were not line dup correctly so we had to spin it around, no easy feat. But ath the end of the day there it was in place fully connected, so just need it to rain in Tully. ( that shouldn’t take too long)

Monday, June 18, 2012

Here comes the power


The jobs are just getting completed so fast it is hard to keep track we have laid the power cable from the workshop underground to the house and already engaged an electrician who his making up the 2 switchboards required and coming to site soon to install them. All we need next is Ergon to come out and actually put up the poles and cable to get the power there. You would think that working at Ergon would give me some pull to get it done faster, but I think it may be the opposite.
(sorry about the photos blogger has gone back to not rotating them again)



Saturday, June 16, 2012

We have gutters

To our great surprise the gutters have arrived and 3rd time lucky they are correct. A couple of hairy moments to get them on the roof but they are in and storm water down pipes are finally connected now all we need is a tank. We are pretty happy to have ended up with 12m+ one piece gutters (no joins) Chris has come back and levelled of the site pad and placed some rubble over the top, well except for the section that the water and septic pipes have not been laid yet

Wednesday, June 13, 2012

And then there was light - through the windows

The trenching for the stormwater is also done, we have completed this up to 90%......... we are still waiting on the gutters, third time luck hey QLDS.


With all the physical work of digging we decided we needed a rest….. so we installed our 1st window, we chose the bathroom for this, for 2 reasons, if we can ever get a plumber to come out he see without artificial and can start work, and it definitely sheds some light into that end of the house. Today we knocked off 5 mins early J
 
One window in, but wait it needs to come out again, we have finally worked out the window installation design so we need to take it out to make a slight adjustment. We are adding an angle iron bar across the top of them all to fill in the profile gap to ensure no water can leak in under any circumstances. So 2 windows now completed

Saturday, June 9, 2012

A Trenching we will go




 
Finally the sun has burned through the clouds and we have had a sunny week so away with the trenching Chris goes. We have trenching for the electrical cables (house to workshop down the middle of the driveway) for this we needed another new tool! A trenching shovel, and after a day shovelling I guess I can see why we needed one, so many different tools, it makes some many jobs easier.


Sunday, June 3, 2012

Room Room Room

Well another weekend of rain, so no trenching to be done again. We have purchased the materials to build the internal walls so we make that our goal for the weekend. It is quite easy and doesn’t take a lot of effort compared to other jobs we have done in the past.



So an easy day on Saturday with 3 walls completed. We now have a bathroom laundry, bedroom 2 & the study. We were really impressed at how big each room turned out.

 We plant our latest fruit tree, an Abui which is a native of the Amazon region. It tastes like caramel custard but is not grown commercially as it does not travel, another addition to our ever going orchard.



Sunday, May 20, 2012

The Wet has returned

And we thought the wet season was over, how wrong were we? This weekend it rained most of the day on Saturday and really poured down Saturday night. Lucky we have the roof on because the rain does not really interfere in our plans anymore.

There was a break in the weather so Andy climbed up the ladder for the 500thtime to put up the last of the gutter brackets, while I had a very important job of holding the ladder



While we were waiting for the plumber to arrive, we fitted all of the ceiling battens in our bedroom. That went all well except for the 5 minutes we had an encounter with a large huntsman spider, Andy chased it around for a while trying to catch it, in the end we secured it under an old butter container with some cutting blades on top just in case he had super powers and would have been able to escape. When we had finished the ceiling battens I remove the spider from the house back outside where it belongs.

.


Plumber 1 never turned up! (he didn’t even  bother call to say he couldn’t make it, bloody tradies). So that gave a young local lad Levi the opportunity to quote on the work. We are crossing our fingers he will be able to come through with a competitive price.

 I think the most fun thing we did on Saturday was pulling out / cutting down the 3 palm trees on our neighbors block. We had to do this, it was requested by Ergon, and we didn’t want to give them any excuses as to why they have to delay erecting the power poles, which would delay our connection to mains power.

Most of Sunday was spent clearing the re-growth from the edge of the rainforest, just so the sakes have time to realize that they are out in to open and to turn around an head back into the protection of the rainforest.

I armed myself with the whipper snipper and tackled the grass that was starting to smother one of your re-vegetated sites.

And we thought the wet season was over, how wrong were we? This weekend it rained most of the day on Saturday and really poured down Saturday night. Lucky we have the roof on because the rain does not really interfere in our plans anymore.

After that we marked out where the trenches need to be dug for the storm water / plumbing / and electrical. But with the forecast for next week – rain, rain, and more rain I don’t think the trenches will get dug, and I bet we have to re-marks the ground again.




Saturday, May 5, 2012

We have a Roof


So the bid day has arrived, its roofing day. With some additional help from Muna, Klaus and Damien we set about roofing the house. After a pilot test of fitting insulation and sheeting we were away. It is hard work on the roof laying insulation and roofing especially with our limited scaffolding to make the job easier.  After a long days effort thought it was done all the sheets were laid in a single day.



A special thanks to the crew who assisted. That left Tina and I 2 days to finish fitting all the roofing screws and fitting the Ridge & Barge capping. Well we can say apart form the odd screw and a little tidy up work the roof is finished with only the gutters left to complete this mammoth part of our project. It is a huge step and really makes it look like we are making progress again




Tuesday, May 1, 2012

New Car Park


In an effort to create some level parking, especially after the Tojo crash in the car park. Our excavator man Jess was summoned back to site to cut out a car park and a flat area behind the container. We have noticed that Jess does like to dig and soon we were convinced that if we are going to cut out a section behind the container we ay as well make it big enough to drive a car down. This sounds good in theory but wow do we have some big embankments now. So now some clever planning will be required to ensure these do not wash away in the rain.